Penmann has completed a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The project encompassed the end-to-end implementation of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based on https://socialrator.com/story11887992/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2