Even then the business needs a further expenditure of $1.3 million for remaining built around the pattern as at first planned out with the entrepreneurs. This demonstrates how the Preliminary expense was not worked out effectively and neither have been the sources of finance planned out correctly. A case https://hbr-case-study-help30677.amoblog.com/rumored-buzz-on-hbs-case-study-analysis-58403034