The FPS operates a certification process for Doing work platforms and also the Principal Contractor is required to sign the certificate confirming the System continues to be thoroughly designed and properly constructed in accordance Together with the design, and that it will be on a regular basis inspected and preserved. https://pennd012zwt9.p2blogs.com/profile